Work Statement Experience record: 1. Employer: AL- Yamama Trading and contracting• Address: Saudi Arabia – Dammam. • Position: Mechanical Engineer (Work shop Manager) • Period: (01/01/2016) to present• Project: Sewage Networks & Pump Station for Faisalia Plans ? Duties ? Research, evaluate, install, operate, and maintain mechanical equipment systems and processes to meet requirements, applying knowledge of engineering principles ? Submits site daily reports, inspection requests, estimates and all applicable monitoring reports, on regular basis or as required.
? Plan and manage project, and prepare material, cost and timing estimates, reports and design specifications for machinery and systems ? Designing and implementing cost-effective equipment modifications to help improve safety and reliability ? Investigate equipment failures and difficulties to diagnose faulty operation, and to make recommendations to maintenance crew. ? Coordinating maintenance and repair services; following manufacturer’s instructions and established procedures; requesting special services. ? Be available to undertake off-site inspections of proposed equipment and materials as may be deemed necessary by the Project Manager ? Key Achievements: ? My job was focused on Supervising and Inspecting in order to finalize the handing over of the project mechanical systems complying with design intent, project specification and international codes. ? Choose and decide the suitable needed materials and equipments for the project According to the material specification list and pressure temperature rating.? Calculate direct and indirect cost of materials and equipment by Using Escalation Formula’s and applies that equation to SAP program (System Applications Products). ? Used my previous study and experience to made a service schedule for each equipment regarding its model and used and linked this service with daily check list and also I applied Earned Value Plan (EVP) strategy to reduce number of equipment in the project and service cost? Made a new design to add additional Guard room as per client request by increasing the sloop and minimize pumping distance and install additional dewatering pumps in the middle of the piping lane in order to avoid the environmental hazard.
- Thesis Statement
- Structure and Outline
- Voice and Grammar
- Conclusion
? I attended daily, weekly and monthly meetings with my manager to present the project progress report to discuss safety issues, quality control and time schedules for the quality delivery of work. Also, I have a monthly meeting with consultant and clients to discuss approval status for work done and also got their advice about changes and technical issues.? I managed my team successfully and achieved the required goals of the project. I prepared a weekly look ahead schedule for activities that needed to be done in the upcoming week and monitored their work regularly.? I had lots of tasks that I had to accomplish. One of them is site tasks to supervise installation of the pump station with its component and make Inspection and operating tests as per design and international codes aside from keeping all equipment in working condition.? In parallel office duties, I had to full fill like reviewing submittals for shop drawings, material supply and service reports.
Weekly meetings I had to attend to highlight major problems on site with the project manager and my colleagues to adopt acceptable solutions generated by me. Moreover, to obtain better results in work and in coordination, I treated my subordinates friendly and respectfully for all of the above, I think that I greatly contributed to project progress.2. Employer: AL- Yamama Trading and contracting• Address: Saudi Arabia – Dammam. • Position: Mechanical Engineer (Work shop Manager) • Period: (15/06/2014) to (01/01/2016) • Project: Saudi Aramco North Park Offices Complex project? Duties ? Install and maintain mechanical equipment, systems and processes to meet requirements, applying knowledge of engineering principles ? Submits site daily reports, inspection requests, estimates and all applicable monitoring reports on regular basis or as required.? prepare material, cost and timing estimates, reports and design specifications for machinery and systems ? implement cost-effective equipment modifications to help improve safety and reliability? Investigate equipment failures and difficulties to diagnose faulty operation, and to make recommendations to maintenance crew. ? Ensures that all the works done are in accordance with the approved construction drawings, contract documents, project specifications, and all applicable standards whether local, national or international standards ? Key Achievements: ? Test the equipment in many factors like mass and dimension test, load test (stability and strength), and operation tests (operating speed-Hydraulic component- safety devices .
..Etc), all must comply with international standard.? Create a small workshop on site in order to minimize our external cost and time talking into considerations some factors such as safety, possibility of future expanding, and Maintenance and repair workshop costs which include (Capital Cost) and (Running Cost). ? Calculate workshop requirements such as Buildings and facilities, Manpower, Equipment, tools and equipment, Documents and Documentary cycle, Guidance publications and the number of workplaces and workspace area, Based on the maintenance schedule of the equipment.? I’ve learned that it is not about the number of problems you are facing it is about the type of problem which can be broken down to smaller problems that can be solved each in its scale. ? I have had good relations with all my colleagues as well as with high management, and I’ve earned their respect through hard work and supportive ideas and by keeping all adequately informed with problems encountered and site progress. ? I create new strategies particularly in using equipment and making maintenance by making picture showing the instruction of user and service because there were a lot of operators cannot speak different languages and are not educated enough.
3. Employer: Alhamrani United Company• Address: Saudi Arabia – Riyadh• Position: Mechanical Engineer (Work shop Manager) • Period: (03/03/2007) to (01/06/2014) • Project: Faisalia service center Workshop project? Duties ? Responsible for maximizing workshop utilization, productivity, and efficiency.? Test all equipment after repair with NVH concern (Noise, Vibration and Harshness) to ensure repair quality on all appropriate comebacks.? Participates in local and regional new model conformity test drive, report results and follows-up improvement of weak areas.? Provide careful planning objectives and action in forecasting labor sales budget for workshop based on available resources.? Ensure proper utilization of all the service facilities and maintains equipment in effective, proper and safe working condition.? Develop maintenance standards, schedules, and programs to maintenance crews.? Active participation in Nissan Technical training and seminars and doing one’s best to acquire and develop technical competency.? Key Achievements: ? Responded professionally to a customer complain about new production manufacture fault by making a technical report to warranty department after analyzing the test result of the internal Shear strength, hardness, and also to study the macro structure.? During my work period in Alhamrani United Company, I got a valuable experience in many aspects of mechanical engineering process such as rigging and lifting of the equipment, pri and final alignment for rotating equipment with gauges and laser such as pumps, fans, compressors and turbines.? I prepared a technical report about project scrap categories and how to separate it which reflect my knowledge to Identify and understand the interactions between engineering systems and people in the social, cultural, environmental, commercial, legal and political contexts in which they operate, including both the positive role of engineering in sustainable development and the potential adverse impacts of engineering activity in my project.? I also Presented a professional image in all circumstances, including relations with clients, stakeholders, as well as with professional and technical colleagues across wide-ranging disciplines? I prepared a skilled check list and asked each technician to fill it individually, containing their experience limits, then after service manager approval I asked training department officially to make a test for them, then I divided them into groups each group contains various experiences so they can swap it during daily work.? I made researches on the internet about the system which was used by my company “Karridge” and I created a method to calculate KPI “key performance indicator” for each technician which helps us, later on, to reduce the cost by Reduce labor cost of direct worker.? I learned the usage of the new technology in determining the malfunction of vehicles by computers and operating it from the senior engineer and several mechanics and also I studded its model and specification from the catalogue until I mastered it and taught the rest of mechanics how to use it as well.